top of page
DDG_Header_Logo.png

Bitter Creek Bridge

As the lead survey and materials testing consultant, we worked with the general contractor to reconstruct the Ministry of Transportation and Infrastructure’s main bridge on Hwy 37A into to Stewart BC. The Project consisted of the demolition of an existing bridge, construction of a 51 meter, clear span bridge and removal of a detour bridge.

The Kitimat Modernization Project (KMP) is a multi-billion dollar project for the modernization of the 60 year-old Kitimat smelter. It is one of the largest private construction projects in British Columbia’s history. KMP will increase the smelter’s previous production capacity by 48 per cent to approximately 420,000 tonnes per year.

BitterCreekBridge
bottom of page